Kennett
Project name: Nazareth Senior Campus – Stage 3
This project was extremely complex covering the construction of all the facilities required of a highly respected secondary school. The school had made a commitment to parents of an opening date that could not be moved. This required Kennett to commence construction with documentation still be resolved. A very strong relationship between client, consultants and the builder engendered an atmosphere of trust and mutual respect. Within this spirit of cooperation Kennett’s project managed the delivery of this school, meeting all the objectives set. Very high end but durable finishes were selected by the architect which were essential to achieve a superb outcome. Respect for the designers was clearly shown in maintaining these finishes whilst under value management scrutiny. The finishes achieved both internally and externally was exceptional. In all other assessment criteria Kennett scored very highly consequently resulting in them being a worthy winner of this category.
Sponsored by CSR Bradford